VRC Metal Systems
Previous Next VRC Metal Systems This project required the renovation of a former elemetary school into the new headquarters facility for VRC Metal Systems. The existing elementary school consisted of…
Previous Next VRC Metal Systems This project required the renovation of a former elemetary school into the new headquarters facility for VRC Metal Systems. The existing elementary school consisted of…
Previous Next North Haines Volunteer Fire Department The North Haines Volunteer Fire Department needed to increase their building's size with a two-bay addition off of the existing metal building. Altering…
Previous Next First State Bank of Newcastle Remodel The First State Bank renovation located in Newcastle, WY, incorporated the warm existing teak wood accents paired with updated contemporary finishes to…
Danville National Cemetery New Committal Shelter Fourfront Design provided architectural design to Danville National Cemetery to build a new committal shelter. The former shelter was outdated, too close to the…
FE Warren Air Force Base Military Working Dogs Kennel This new 4,619 SF Military Working Dog (MWD) Kennel Facility includes room for one kennel master, two trainers, eight handlers, and…
Previous Next Westhills Village Courtyard FourFront Design designed the remodel of the Westhills Village Courtyard. We want to create a space that appealed to both residents and family members or…