Previous
Next
North Haines Volunteer Fire Department
The North Haines Volunteer Fire Department needed to increase their building’s size with a two-bay addition off of the existing metal building. Altering existing HVAC, plumbing, electrical power and lighting, fire suppression sprinklers, and fire alarm was required. The fire department was able to maintain the existing structure and function during the construction of the addition.
-
ClientSouth Dakota Firefighters Association, Inc.
-
LocationRapid City, South Dakota
-
ScopeArchitecture, Mechanical Engineering
-
Year Completed2019