Saratoga National Cemetery Administration Building HVAC System Modification and Equipment Replacement

Our professionals conducted a life cycle cost analysis (LCCA) of the existing HVAC system for the Administration Building on this site which completed the 15% design phase.

The LCCA evaluated the implementation of 4 different HVAC systems and compared those to the existing system. After conducting the LCCA, the team completed construction design documents and specifications for the new HVAC system to be installed.

The new design is estimated to save approximately $2,500 – $3,000 per year in utility costs.

  • Client
    Department of Veterans Affairs
  • Location
    Schuylerville, New York
  • Scope
    Mechanical Engineering
  • Year Completed
    2016